Monday, 10 September 2007

Fuel lines

We have acquired fuel lines and also the various bits to connect them to the engine. Also got Riv nuts and a riv nut tool that cost us R400 but at least we can do a proper job now.

Then on Saturday the old man managed to find an alternator for R200 although the mounting bracket is wrong, still to go is the oil pickup, dizzy and about a million rubber pipes for the vacuum sensors and cooling system.

I still get very scared when I think of all that needs to be done and how little I know about any of it. So far we have managed, so the aim of the game is slow but steady!

No comments: